News & Events

PT. TIMAS AWARDS TOTAL E.P INDONESIE BEKAPAI PHASE 2B EPSC 2 PROJECT FOR AUTOWELDING SERVICES

Posted on: Jun, 2015

OAG Welding Division secures the first Auto Welding scope for the TOTAL E.P Indonesie Bekapai Phase 2B EPSC 2 – Pipeline Installation Project. Working with our partner, we have successfully completed the 12’’, 10.2 WT pipeline within the planned schedule.

With the group’s expertise in managing projects offshore, we are now able to offer a complete “Firing Line” services to cater  for Clients that would like to dedicate this portion of scope to competent vendor, enabling them to focus on the main stream of pipeline installation.

OAG HAS THAT CAPABILITY FOR FAST TRACK PROJECT ON WQT

Posted on: May, 2015
OAG was awarded a contract by a joint venture between Hyundai Heavy Industry and Sapura Acergy for Booster Compression Project, a fast track Internal Welders Qualification Test (WQT). The execution of this WQT indeed proves our capability to carry out fast track project at very short notices.

OAG FIRST TEAM BUILDING TO RAISE TEAMWORK SPIRIT

Posted on: Apr, 2015
OAG held its first annual team building activity at Kota Permai Golf and Country Club in Shah Alam. The objective of this activity is to cultivate team work sprit between departments and colleagues in achieving the company’s vision, mission and goals. 

OAG NEW OPERATION FACILITY AT ABU DHABI, UAE

Posted on: Mar, 2015

Following the award of our projects in Middle East, OAG have completed the setup of its operation facility at Abu Dhabi, United Arab Emirates. This facility is strategically located at Abu Dhabi, UAE to further support our Clients both onshore and offshore from the regions of Middle East, Europe and Africa.

The facility in Abu Dhabi is able to support OAG’ s expansion throughout the regions and being a global player in providing a full spread of services which include Welding, Non-Destructive Testing and Field Joint Coating for the onshore & offshore activities.

Korea’s Hyundai Heavy Industries awards the Qatari RasGas Flow Assurance Project

Posted on: May, 2014

OAG has been awarded the prestigious Flow Assurance Project (FAP) at the giant North Field. This project will last for 180 days with the installation of 6’’ x 183 kilometres gas pipeline. This project will demonstrate OAG’s capabilities in providing a complete Field Joint Coating Services covering Surface Preparation, Induction Heating, Infill Coating and our newly introduced service Fusion Bonded Epoxy (FBE). This project will be a testament to OAG’s well-established Quality, Health and Safety policies.

OAG starts of Q2 2014 by introducing Automatic Welding System (AWS) Services

Posted on: Apr, 2014

To enhance current established services, OAG had launched automatic welding system catering to both Onshore and Offshore projects. OAG well understands the demand and expectation of the industry through our experiences working with the Clients in Field Joint Coating and Non Destructive Testing services and is positioned well to provide innovative equipment and technology solutions to meet the demands of today’s challenging environment.

Our welding team has researched and developed new and improved welding services covering automatic and semi-auto solutions that will help shape the core services provided by OAG and pass on the technical advantages to Clients. Our emphasis for this services is to influence the current technology in order to bring effectiveness in terms of technical, operational and cost effective benefits to our customers and by customized to their requirements and commercial.

 

OAG working for the prestigious Mobil Cepu Banyu Urip Project

Posted on: Mar, 2014

OAG completed the fully insulated pipeline at the prestigious Banyu Urip Project, offshore Indonesia, working for PT Rekayasa Industries. With full scope of Blasting, Application of Canusa High Built Epoxy and Customized Hybrid Solution (PUF and Solid Polyurethane). In this project, OAG recorded Zero downtime and praised by Mobil Cepu for our commitment and reliability in this full scope throughout the entire campaign of 100 days. 

Page : 1 2 3 4 5
Previous Page Next Page